Power supply switch apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9841797
SERIAL NO

14683689

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply switch apparatus includes a first interface, a switch circuit, and a power supply circuit. The first interface includes a first control signal output terminal, a second control signal output terminal, and a third control signal output terminal. Each of the first control signal output terminal, the second control signal output terminal, and the third control signal output terminal outputs a control signal according to an electronic device inserted in the first interface. The switch circuit receives the control signals and outputs a power supply signal accordingly. The power supply circuit receives the power supply signal, and provides a first direct current (DC) voltage or a second DC voltage to the electronic device according to the power supply signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HON HAI PRECISION INDUSTRY CO LTD66 CHUNG SHAN ROAD TU-CHENG DIST NEW TAIPEI
HONG FU JIN PRECISION INDUSTRY (WUHAN) CO LTDNO 1 2ND OPTICAL VALLEY ROAD EAST-LAKE DEVELOPMENT ZONE WUHAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Chun-Sheng New Taipei, TW 160 207
Li, Dao-Wei Wuhan, CN 7 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00