Modular hybrid dovetail rail clamping assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9841258
SERIAL NO

15273835

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A modular dovetail rail clamping assembly includes a polymer body and a metal fixed clamp component. A threaded fastener extends through the body and into the fixed clamp component to draw the fixed clamp component into engagement with the body. The fixed clamp component and the body have mating longitudinal ridge and groove structures which rigidly fix alignment of the fixed clamp component relative to the body when assembled. A metal movable clamp component opposes the fixed clamp. A threaded clamping fastener extends through the movable clamp component and the body, and is received into the fixed clamp component to draw the movable clamp component into engagement with the body. A removable, reversible crossbar extends transversely across the body between the fixed clamp component and the movable clamp component.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EMISSIVE ENERGY CORP135 CIRCUIT DRIVE NORTH KINGSTOWN RI 02852

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Galli, Robert D North Kingstown, US 109 2700
O'Brien, Christopher North Kingstown, US 33 170
Okruta, Kevin North Kingstown, US 8 98

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00