Variable shape three-dimensional structure using extendable arm

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9840837
SERIAL NO

15428453

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A variable shape three-dimensional structure includes: an upper frame; a lower frame; and a longitudinal coupling member that couples the upper and lower frames. Each of the frames includes cross units and an end coupling portion. Each cross unit is formed by two rigid members crossing each other and pivotally coupled together. The end coupling portion pivotally couples the ends of the rigid members of the cross units. The longitudinal coupling member includes a bent unit comprising a first and second bent rigid members, and a bent portion coupling shaft. The first and second bent rigid members are bent in a V-shape. The bent portion coupling shaft pivotally couples the bent portions of the first and second bent rigid members. The upper end of the bent unit is coupled to the upper frame and the lower end of the bent unit is coupled to the lower frame.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJIMIYASEISAKUSHO CO LTDXIONGBEN COUNTY JAPAN THE CITY OF 1825 WORDS 50 TIMES

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsuoka, Norimichi Kumamoto, JP 12 54

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00