Method for manufacturing magnesium fluoride sintered compact, method for manufacturing neutron moderator, and neutron moderator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9868673
APP PUB NO 20160326062A1
SERIAL NO

15216536

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There are provided a method for manufacturing a magnesium fluoride sintered compact to be free from cracks and chipping and to have high relative density, a method for manufacturing a neutron moderator, and the neutron moderator. The method for manufacturing a magnesium fluoride sintered compact includes a powder filling process for filling a magnesium fluoride powder material into a die by tapping, and an intermediate body sintering (pulsed electric current sintering) process for performing pulsed electric current sintering for sintering the filled magnesium fluoride powder material while applying a pulsed electric current thereto, to obtain a magnesium fluoride sintered compact (intermediate body).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON LIGHT METAL COMPANY LTD2-20 HIGASHI-SHINAGAWA 2-CHOME SHINAGAWA-KU TOKYO 140-8628
CANCER INTELLIGENCE CARE SYSTEMS INCTOKYO 135-0063

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Furuya, Hidaka Inazawa, JP 9 18
Nakamura, Masaru Tokyo, JP 243 2564
Sanada, Kazuto Tokyo, JP 7 23
Sugawara, Yoshinori Tokyo, JP 3 17
Takei, Shinichi Niigata, JP 4 26
Usui, Hideaki Tokyo, JP 16 80

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00