Manufacturing method for high-pressure tank, and high-pressure tank

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9840048
SERIAL NO

13980718

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A step of forming a low-angle helical layer on an outer surface of at least part of each liner dome portion and an outer surface of a liner cylindrical portion, a step of forming an inner hoop layer on an outer surface of the low-angle helical layer on the liner cylindrical portion, and a step of forming a mixed layer by alternately laminating a low-angle helical layer and an outer hoop layer on an outer surface of the inner hoop layer and low-angle helical layer on each liner dome portion. Then, on the liner cylindrical portion, 90% or more of the sum of the thickness of the inner hoop layer and the thickness of the outer hoop layer in the mixed layer is arranged within the range of 75% of the fiber reinforced plastics layer adjacent to the liner in a thickness direction of the fiber reinforced plastics layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nishibu, Shiro Nagoya, JP 6 43
Otsubo, Hirokazu Nagoya, JP 17 154

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00