Manufacturing method and manufacturing apparatus of press-formed body

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9839951
SERIAL NO

14408175

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A press-formed body (15) made of a high-tensile strength steel sheet of 390 MPa or more including a groove bottom part (15a), ridge line parts (15b, 15b) continuous to the groove bottom part (15a), and side wall parts (15c, 15c) continuous to the ridge line parts (15b, 15b), and in which an outward flange (16) is formed at an end part in a longitudinal direction is manufactured by a press-forming apparatus including a punch (11), a die (12), and a pad (14) which presses and binds a press-forming material (13) to the punch (11), thereby forming the press-formed body (15) without providing cutouts at a ridge line part flange portion of the outward flange, or generating lowering of material yield.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CORPORATIONTOKYO JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ikeda, Yoshiyuki Tokyo, JP 28 371
Masuo, Yoshihiko Tokyo, JP 4 19
Nakazawa, Yoshiaki Tokyo, JP 110 578
Nishimura, Ryuichi Tokyo, JP 40 138
Otsuka, Kenichiro Tokyo, JP 77 298
Suzuki, Toshiya Tokyo, JP 147 6629

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00