Method for producing a steel tube including cleaning of the inner tube wall
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Dec 12, 2017
Issued Date -
N/A
app pub date -
Mar 11, 2014
filing date -
Mar 18, 2013
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
A method for producing a steel tube including the step of the manufacturing a steel tube having an inner tube wall, an outer tube wall, and a free tube cross-section enclosed by the inner tube wall, wherein after the manufacturing, the steel tube includes at least one contaminant on the inner tube wall. After the manufacturing of the steel tube, the inner tube wall is cleaned by introducing liquid or solid CO2 into the free tube cross-section, and of applying the liquid or solid CO2 onto the inner tube wall to remove the contaminant therefrom.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
SANDVIK MATERIALS TECHNOLOGY DEUTSCHLAND GMBH | 40549 DÜSSELDORF |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Frobose, Thomas | Versmold, DE | 13 | 18 |
# of filed Patents : 13 Total Citations : 18 | |||
Rauffmann, Udo | Werther, DE | 13 | 15 |
# of filed Patents : 13 Total Citations : 15 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 1 Citation Count
- B65H Class
- 28.75 % this patent is cited more than
- 8 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Jun 12, 2025 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jun 12, 2029 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
