Charged engineered polymer beads/bubbles functionalized with molecules for attracting and attaching to mineral particles of interest for flotation separation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9839919
SERIAL NO

14400697

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Apparatus is providing featuring a synthetic bead having a solid-phase body with a surface, and being configured with a predetermined electric charge so as to respond to a corresponding predetermined electric field; and a plurality of molecules attached to at least part of the surface, the molecules comprising a functional group selected for attracting and attaching one or more mineral particles of interest to the molecules. Some combination of the solid-phase body or the surface may be configured from a polymer. The polymer may be polyethylenimine. The polyethylenimine may be engineered or configured to be highly charged so as to be used to collect the mineral particles of interest and then manipulated through and by the corresponding predetermined electric field.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CIDRA CORPORATE SERVICES INC50 BARNES PARK NORTH WALLINGFORD CT 06492

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Davis, Michael A Glastonbury, US 114 3101

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00