Method for producing hydrogenation catalyst

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9839904
SERIAL NO

14007711

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a method for producing a hydroprocessing catalyst including a supporting step of allowing a catalyst support having a content of a carbonaceous substance containing carbon atoms of 0.5% by mass or less in terms of carbon atoms to support an active metal component containing at least one active metal element selected from metals belonging to Group 6, Group 8, Group 9 and Group 10 in the periodic table, to obtain a catalyst precursor, and a calcining step of calcining the catalyst precursor obtained in the supporting step to obtain the hydroprocessing catalyst.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COSMO OIL CO LTD1-1 SHIBAURA 1-CHOME MINATO-KU TOKYO 105-8528
JAPAN OIL GAS AND METALS NATIONAL CORPORATION2-10-1 TORANOMON MINATO-KU TOKYO 105-0001
JX NIPPON OIL & ENERGY CORPORATIONCHIYODA-KU TOKYO 100-8162
JAPAN PETROLEUM EXPLORATION CO LTDTOKYO JAPAN
INPEX CORPORATION5-3-1 AKASAKA MINATO-KU TOKYO 107-6332
NIPPON STEEL & SUMIKIN ENGINEERING CO LTD5-1 OSAKI 1-CHOME SHINAGAWA-KU TOKYO 141-8604

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iwama, Marie Tokyo, JP 27 63

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00