Virtual viewpoint synthesis method and system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9838663
SERIAL NO

15009854

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A virtual viewpoint synthesis method and system, including: establishing a left viewpoint virtual view and a right viewpoint virtual view; searching for a candidate pixel in a reference view, and marking a pixel block in which the candidate pixel is not found as a hole point; ranking the found candidate pixels according to depth, and successively calculating a foreground coefficient and a background coefficient for performing weighted summation; enlarging the hole-point regions of the left viewpoint virtual view and/or the right viewpoint virtual view in the direction of the background to remove a ghost pixel; performing viewpoint synthesis on the left viewpoint virtual view and the right viewpoint virtual view; and filling the hole-points of a composite image.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PEKING UNIVERSITY SHENZHEN GRADUATE SCHOOL518055 ROOM 208 BUILDING H BEIDA PARK SHENZHEN UNIVERSITY TOWN XILI STREET NANSHAN DISTRICT SHENZHEN CITY GUANGDONG PROVINCE SHENZHEN CITY GUANGDONG PROVINCE 518055

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gao, Wen Shenzhen, CN 329 3875
Li, Chenxia Shenzhen, CN 9 59
Wang, Ronggang Shenzhen, CN 78 337

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00