Commutation current steering method in a zero volt switching power converter using a synchronous rectifier

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9837920
APP PUB NO 20150092450A1
SERIAL NO

14231797

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A commutation current steering method is provided for a power converter having an isolation transformer, a plurality of primary ZVS switches, a plurality of secondary switches for synchronous rectification, and a boosting resonant circuit. A commutation current is shared between all of the switches, and a resonance is induced in the boosting resonant circuit by controlling each of the synchronous rectifier switches to turn off at a time prior to a turn-off time for a corresponding one of the switches operating under ZVS conditions, wherein the primary current is boosted above a minimum commutation value during ZVS periods. The ZVS switches are further driven with a constant dead time, and the synchronous rectifier switches are driven to provide a fixed time relation with respect to all of the switches.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BEL POWER SOLUTIONS INC152 N THIRD STREET SUITE 805 SAN JOSE CA 95112

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Feno, Ivan Bertschikon, CH 10 82

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00