Power conversion system for providing a current to meet operation of an electronic device by varying a leakage inductance thereof and method for providing the current thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9837886
SERIAL NO

15073319

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power conversion system includes an isolating transformer (30) and an output-controlling device (40). The isolating transformer (30) includes a primary winding (310) and a plurality of secondary windings (320320d) coupled with the primary winding (310), and the isolating transformer (30) has a plurality of coupling distances between the secondary windings (320320d). The output-controlling device (40) includes a controller (420) and a plurality of output-controlling modules (400400d), wherein each one of the secondary windings (320320d) is electrically connected to one of the output-controlling device (400400d). The controller (420) places at least one output-controlling device (400400d) in a conducting state for output a rectified power. An amount of the secondary windings (320320d) coupled with the primary winding (310) is modulated for varying a leakage inductance of the power conversion system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHICONY POWER TECHNOLOGY CO LTD30F NO 69 SEC 2 GUANGFU RD SANCHONG DIST NEW TAIPEI CITY 241

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsiao, Cheng-Chang New Taipei, TW 12 25
Hsiao, Yung-Hung New Taipei, TW 27 65
Hsu, Hao-Te New Taipei, TW 17 50
Hu, Chih-Kuan New Taipei, TW 2 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00