Separation membrane for redox flow secondary battery and redox flow secondary battery comprising the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9837678
APP PUB NO 20160260988A1
SERIAL NO

14442148

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The redox flow secondary battery includes an electrolytic cell including a positive electrode cell, a negative electrode cell, and a separation membrane that separates the positive electrode cell and the negative electrode cell. Moreover, the above described redox flow secondary battery is configured as follows. That is, the separation membrane has a microporous membrane and an ion-exchange resin layer contacting the microporous membrane, and the air resistance of the separation membrane per thickness of 200 μm is 10000 sec/100 cc or more. Furthermore, the microporous membrane includes a polyolefin resin or a vinylidene fluoride resin and an inorganic filler. Further, the smoothness of at least a surface of the microporous membrane contacting the ion-exchange resin layer is 16000 seconds or less.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ASAHI KASEI BATTERY SEPARATOR CORPORATION1-1-2 YURAKUCHO CHIYODA-KU TOKYO 100-0006

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Miyazawa, Hiroshi Tokyo, JP 107 941
Takahashi, Tomoaki Tokyo, JP 131 1031
Takeda, Hisashi Tokyo, JP 21 197

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00