Method for producing NdFeB system sintered magnet

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9837207
SERIAL NO

14397564

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a NdFeB system sintered magnet. The method includes: a hydrogen pulverization process, in which coarse powder of a NdFeB system alloy is prepared by coarsely pulverizing a lump of NdFeB system alloy by making this lump occlude hydrogen; a fine pulverization process, in which fine powder is prepared by performing fine pulverization for further pulverizing the coarse powder; a filling process, in which the fine powder is put into a filling container; an orienting process, in which the fine powder in the filling container is oriented; and a sintering process, in which the fine powder after the orienting process is sintered as held in the filling container. The processes from hydrogen pulverization through orienting are performed with neither dehydrogenation heating nor evacuation each for desorbing hydrogen occluded in the hydrogen pulverization process. The processes from hydrogen pulverization through sintering are performed in an oxygen-free atmosphere.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DAIDO STEEL CO LTDNAGOYA-SHI AICHI 461-8581

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mizoguchi, Tetsuhiko Kyoto, JP 43 1090
Sagawa, Masato Kyoto, JP 88 1129
Une, Yasuhiro Nagoya, JP 5 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00