Electrical network topology determination

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9835662
APP PUB NO 20160154040A1
SERIAL NO

14558571

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Determination of electrical network topology and connectivity are described herein. A zero-crossing is indicated at a time when the line voltage of a conducting wire in an electrical grid is zero. Such zero-crossings may be used to measure time within a smart grid, and to determine the connectivity of, and the electrical phase used by, particular network elements. A first meter may receive a phase angle determination (PAD) message, including zero-crossing information, sent from a second meter, hereafter called a reference meter. The first meter may compare the received zero-crossing information to its own zero-crossing information. A phase difference may be determined between the first meter and the reference meter from which the PAD message originated. The first meter may pass the PAD message to additional meters, which propagate the message through the network. Accordingly, an electrical phase used by meters within the network may be determined.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ITRON FRANCE S A S2111 N MOLTER ROAD LIBERTY LAKE WA 99019

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Driscoll, Timothy James Raleigh, US 16 103
Higgins, Christopher M Wake Forest, US 31 254
Sonderegger, Robert C Oakland, US 4 268
Van, Wyk Hartman Montloius sur Loire, FR 32 461

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00