Spectral, polar and spectral-polar imagers for use in space situational awareness

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9835491
SERIAL NO

13900768

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An imager for imaging a plurality of images of a single scene over a plurality of disparate electromagnetic wavelength sets includes front-end optics for outputting a polychromatic, collimated image beam of the scene; a beam displacer configured for splitting the collimated image beam into spatially displaced, mutually parallel beams, and an imaging-sensor array configured for registration of the spatially displaced wavelength sets at disparate locations along the imaging-sensor array. In alternative versions, the beam displacer displaces constituent light beams based on at least one of wavelength and polarization. In various implementations, a back-end focusing element focuses each constituent beam onto a predetermined location along the imaging-sensor array. The imaging-sensor array is optimally configured for simultaneous sampling of the plural images focused thereupon by the back-end focusing elements.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOLID STATE SCIENTIFIC CORPORATION27-2 WRIGHT ROAD HOLLIS NH 03049

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mooney, Jonathan Martin Irvine, US 5 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00