Evaporative gas generating device, method for producing evaporative gas, hydrogen bromide production device, and method for producing hydrogen bromide

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9835325
SERIAL NO

14390657

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An evaporative gas generating device and a method for producing evaporative gas. A hydrogen bromide production device and a method for producing hydrogen bromide are also disclosed. The hydrogen bromide production device is provided with an evaporative gas generating device (1) that generates bromine gas, and a reactor (3) that reacts the bromine gas with hydrogen gas to form hydrogen bromide. The evaporative gas generating device (1) is provided with a container (10) that accommodates liquid bromine (B), and heating jackets (35, 36) that supply heat to a wall surface of the container (10), and heat and evaporate the liquid bromine (B) within a liquid accommodating part (15) of the container (10) to raise the temperature of the bromine gas within the evaporative gas accommodating part (16).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RESONAC CORPORATION9-1 HIGASHI-SHIMBASHI 1-CHOME MINATO-KU TOKYO 1057325 ?1057325

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Saito, Hirohide Tokyo, JP 30 75
Wada, Masaru Tokyo, JP 100 755

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00