Systems and methods for energy optimization for converterless motor-driven pumps

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9835160
APP PUB NO 20160160862A1
SERIAL NO

14563119

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A converterless motor-driven pump system includes an off-grid prime mover, an electric power generator driven by the off-grid prime mover to generate a power output, an electric submersible pump (ESP) system, and a system controller. The ESP system includes a motor coupled to the electric power generator to receive the power output, and a pump driven by the motor to pump a fluid. The system controller includes a processor and a memory. The memory includes instructions that, when executed by the processor, cause the system controller to control the off-grid prime mover as a function of an operational parameter of the ESP system to maintain a desired operating point of the pump, and control the electric power generator to reduce the power output generated by the electric power generator while the desired operating point of the pump is maintained.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAKER HUGHES OILFIELD OPERATIONS LLC17021 ALDINE WESTFIELD ROAD HOUSTON TX 77073

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aravind, Deepak Karnataka, IN 39 436
Hawes, Nathaniel Benedict Milton, US 24 108
Torrey, David Allan Ballston Spa, US 34 127

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00