Internal combustion engine ignition device and ignition method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9835127
APP PUB NO 20160069319A1
SERIAL NO

14785656

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

When an operating condition including load and speed of an internal combustion engine is in a prescribed low-speed high-load region, i.e., an energy suppression region, having a possibility causing pre-ignition, energization time TDWLMIN for the energy suppression region is selected as a primary coil energization time. In other normal regions, normal energization time TDWL is selected. Normal energization time TDWL has a characteristic such that the normal energization time shortens, as the engine speed increases. In a low speed region, a given energization time that can fulfill a discharge energy required in a high exhaust gas recirculation region is provided. Energization time TDWLMIN for the energy suppression region is constant regardless of engine speeds and relatively short, and is set to a level such that a coil generated maximum voltage does not exceed a withstand voltage of a spark plug even when no-discharge occurs due to pre-ignition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NISSAN MOTOR CO LTDKANAGAWA KANAGAWA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kassai, Masaharu Yamato, JP 11 86
Shiraishi, Taisuke Kawasaki, JP 19 254

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00