System for supplying fuel to an engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9835121
APP PUB NO 20160076495A1
SERIAL NO

14855794

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel-supply system has a fuel pump, a pressure controller, a signal output device and a power switch. The pressure controller adjusts the observed fuel pressure of the fuel and may electronically communicate with a motor driving the fuel pump to regulate the supply of fuel from a fuel tank of the fuel-supply system to an engine. In detail, the pressure controller performs feedback control of a voltage applied to the motor such that the pressure of a fuel pumped from the fuel pump approaches to have a first target and/or ideal fuel pressure value. Further, the signal output device outputs the first target fuel pressure value to the pressure controller. Activation of the power switch supplies power, from a power source, to the pressure controller, the motor and the signal output device. Further, the pressure controller may perform feedback control based on a second target fuel pressure value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AISAN KOGYO KABUSHIKI KAISHA1-1 KYOWA-CHO 1-CHOME OBU-SHI AICHI 4748588 ?4748588

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akita, Minoru Ama, JP 39 335
Tagawa, Naoyuki Nagoya, JP 19 126

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00