Integral analysis method of inter-well tracer tests

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9835024
SERIAL NO

13852394

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates an Integral analysis method of inter-well tracer tests, which integrates and performs continuous feedback to each of the major stage (design, operation and interpretation) allowing quantitative interpretation of these tests. It is presented as a tool to investigate the behavior of injection fluids for recovery of hydrocarbons, as well as for the dynamic characterization of reservoirs. The main advantage of this invention is that it allows a greater certainty in the tracer response and a marked improvement in the sensitivity and quantitative analysis of the test results, since the curves fit both with mathematical models and numerical models. Another outstanding attraction of this invention is the reduction in the costs of testing such applications.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INSTITUTO MEXICANO DEL PETROLEOMEXICO MEXICO CITY MEXICO CITY MEXICO CITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ramirez, Sabag Jetzabeth Mexico City, MX 5 6
Valdiviezo, Mijangos Oscar Cerapio Mexico City, MX 1 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00