Method for extracting beryllium from bertrandite and phenakite mineral groups

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9834826
SERIAL NO

15382956

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention discloses methods for leaching beryllium from a beryllium-containing concentrate or a beryllium-containing ore, comprising contacting the concentrate or the ore with a leaching solution, wherein the leaching solution contains a technical grade hydrochloric acid, wherein the solution contains no sulfuric acid, no nitric acid, and no potassium chlorate, extracting beryllium via a gradual heating process, wherein the technical grade hydrochloric acid is used in varying amounts by volume per liter of leaching solution, and adding ammonium fluoride to the leaching solution in contact with the concentrate or ore, wherein the ammonium fluoride is added in a fractional manner.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AL-FARABI KAZAKH NATIONAL UNIVERSITYAL-FARABI AVENUE 71 ALMATY 050040

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baiboldieva, Aishagul Batyrbekovna Almaty, KZ 4 6
Mutanov, Galymkair Mutanovich Almaty, KZ 3 6
Ospanov, Habibulla Kusainovich Almaty, KZ 4 6
Ospanova, Nazira Habibyllakyzy Almaty, KZ 4 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00