Process for producing high-swellability polymer composites

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9834486
SERIAL NO

14787171

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a process for producing polymer composites suitable for absorbing and storing aqueous liquids, to the polymer composites obtainable by this process, and to the use of the polymer composites. The process comprises free-radical polymerization of a monomer composition M comprising 50 to 100% by weight, based on the total amount of monomers A and B, of at least one monomer A having one ethylenic double bond and at least one neutralizable acid group, 0 to 50% by weight of optionally one or more comonomers B which are different than the monomers A and have one ethylenic double bond, and 1 to 10% by weight, based on the total amount of monomers A and B, of at least one crosslinker C.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BASF SE67056 LUDWIGSHAFEN AM RHEIN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Glaser, Alban Mannheim, DE 23 95
Lopez, Villanueva Francisco Javier Schifferstadt, DE 21 172
Mark, Tina Hassloch, DE 12 29
Sanz-Gomez, Jorge Heidelberg, DE 5 9
Seufert, Michael Bad Duerkheim, DE 14 221
Wiedemann, Alexandra Weisenheim am Berg, DE 6 6
Wissemeier, Alexander Speyer, DE 52 227

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00