Electrically-powered vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9834093
APP PUB NO 20150224878A1
SERIAL NO

14422311

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An EHC is configured to electrically heat a catalyst that purifies exhaust gas from an exhaust path of an internal combustion engine mounted on an electrically-powered vehicle, when a current passes through the EHC. A charger converts AC electric power supplied from an external power supply to a charging port into charging power of a power storage device by a power conversion path including an insulating transformer. The EHC is electrically connected to power lines which are provided on the primary side of the insulating transformer on the power conversion path, and to which a DC voltage is output. In a case where the EHC is operated when the vehicle travels, the charger converts the electric power from the power storage device into the DC voltage output to the power lines connected to the EHC, by a part of inverse conversion of power conversion at the time of external charging.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHATOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hashimoto, Keita Toyota, JP 46 175

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00