Superabrasive tool with metal mesh stress stabilizer between superabrasive and substrate layers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9833870
SERIAL NO

14358383

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-layer polycrystalline superabrasive PCD or PCBN blank for attachment to a working tool is disclosed. The blank comprises an abrasive layer of PCD or PCBN and a substrate layer of cobalt containing cemented tungsten carbide. In between the abrasive and substrate layers is a metal mesh stabilizer layer sintered by HPHT to the abrasive and substrate layers. The apertures of the mesh layer contain PCD or PCBN which, along with the mesh are sintered to the support and substrate layers and cobalt present in the substrate layer is infiltrated through the mesh layer into the abrasive layer as a binder. The metal mesh layer provides stability to the abrasive and substrate layers which have different stress and thermal expansion properties.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ADICO CO LTD184-1 SUNGEUN-RI WONGOK-MYUN ANSUNG-SI KYUNGKI-DO 456-810

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
An, Sook Young Kyungki-do, KR 1 0
Cho, Hyun Sam Salt Lake City, US 8 478
Han, Kyungyul Kyungki-do, KR 1 0
Lee, Hyeang Sup Kyungki-do, KR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00