Irrigation system having terrain compensation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9832940
APP PUB NO 20160309667A1
SERIAL NO

15135208

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control system for an irrigation system is disclosed that is configured to prevent a substantial positional change of the irrigation system while the system is traversing a substantially non-flat terrain, or surface. In an implementation, an irrigation system includes multiple interconnected spans that are supported by multiple tower structures. Each tower structure includes a drive unit for driving a tower structure at a selected speed. The irrigation system also includes a position-determining module configured to determine an actual position of the main section assembly. The irrigation system also includes a control device configured to determine an actual position of the main section assembly, compare the actual position with a desired position of the main section assembly, and to determine that the main section assembly is traversing a substantially non-flat surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VALMONT INDUSTRIES INCNEBRASKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kreikemeier, Bruce West Point, US 9 346

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00