Energy supply module as a two-port network, use of a separating device in such an energy supply module, and method for operating such an energy supply module

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9831715
SERIAL NO

14398451

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to an energy supply module (1) comprising an input gate (2) for connection to a power source (4) and an output gate (3) as an interruption-free power supply, wherein the input gate (2) and the output gate (3) are through-connected separably via an electrical separating device (6), and an auxiliary energy source (10) is connected or can be connected in parallel with the input gate (2) and the output gate (3), wherein the separating device (6) is positioned between the auxiliary energy source (10) and the input gate (2), and the separating device (6) comprises a circuit arrangement having two transistors (15) and two diodes (16), wherein the transistors (15) are connected reversely in series, and a diode (16) is connected to each transistor (15), inversely to the current direction of said diode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PHOENIX CONTACT GMBH & CO KG32825 BLOMBERG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Heinemann, Michael Lage, DE 16 65
Henkel, Hartmut Blomberg, DE 26 92
Zeuch, Jochen Blomberg, DE 17 43

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00