Connector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9831615
SERIAL NO

15487064

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connector includes contacts arranged in a contact-arrangement plane and including a source contact and a signal contact, each of the contacts having a contact portion that comes into contact with a contact of a counter-connector, a ground plate made of metal disposed in parallel with the contact-arrangement plan, an insulator that holds the contacts and the ground plate, and a shell that covers an outer periphery of the insulator and is made of metal, the ground plate being disposed so as to face the contacts through a portion of the insulator with the contact portion of each contact being exposed, and having a cutout formed at an end of the ground plate adjacent to the contact portion of the source contact, and the insulator having a projection that fills the cutout of the ground plate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JAPAN AVIATION ELECTRONICS INDUSTRY LIMITEDTOKYO 150-0043
JAE EUROPE LIMITED200 FOWLER AVENUE FARNBOROUGH BUSINESS PARK FARNBOROUGH HAMPSHIRE GU147JP

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsunaga, Akihiro Tokyo, JP 71 520
Saito, Yuichi Tokyo, JP 162 1943
Sato, Yuzo Farnborough, GB 25 519
Takaku, Masaaki Tokyo, JP 29 315
Ueda, Kouhei Tokyo, JP 20 227
Yokoyama, Yohei Tokyo, JP 84 683

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00