Manufacturing method of interposed substrate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9831103
SERIAL NO

14995207

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A manufacturing method of an interposed substrate is provided. A metal-stacked layer comprising a first metal layer, an etching stop layer and a second metal layer is formed. A patterned conductor layer is formed on the first metal layer, wherein the patterned conductor layer exposes a portion of the first metal layer. A plurality of conductive pillars is formed on the patterned conductor layer, wherein the conductive pillars are separated from each other and stacked on a portion of the patterned conductor layer. An insulating material layer is formed on the metal-stacked layer, wherein the insulating material layer covers the portion of the first metal layer and encapsulates the conductive pillars and the other portion of the patterned conductor layer. The metal-stacked layer is removed to expose a lower surface opposite to an upper surface of the insulating material layer and a bottom surface of the patterned conductor layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIMICRON TECHNOLOGY CORPNO 179 SHANYING RD GUISHAN DIST TAOYUAN CITY 333

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Ming-Chih Hsinchu, TW 70 439
Hu, Dyi-Chung Hsinchu County, TW 146 1379
Tseng, Tzyy-Jang Hsinchu, TW 133 628

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00