Distribution measurement system for pressure, temperature, strain of material, monitoring method for carbon dioxide geological sequestration, assessing method for impact of carbon dioxide injection on integrity of strata, and monitoring method for freezing using same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9829352
SERIAL NO

14417962

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Distributions of a Brillouin frequency shift and a Rayleigh frequency shift in optical fibers set up in a material are measured from scattered waves of pulse laser light entered into the optical fibers, and distributions of pressure, temperature, and strain of the material along the optical fibers at a measurement time point are analyzed using coefficients that are inherent to the set up optical fibers and correlate pressure, temperature, and strain of material with the Brillouin frequency shift and the Rayleigh frequency shift.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RESEARCH INSTITUTE OF INNOVATIVE TECHNOLOGY FOR THE EARTH9-2 KIZUGAWADAI KIZUGAWA-SHI KYOTO 619-0292
NEUBREX CO LTDHYOGO PREFECTURE JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kishida, Kinzo Kobe, JP 30 381
Xue, Ziqiu Kizugawa, JP 7 177
Yamauchi, Yoshiaki Kobe, JP 54 506

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00