Support rail for holding and supplying power to a plurality of lighting modules, and light strip system with such a support rail

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9829184
APP PUB NO 20150109772A1
SERIAL NO

14396792

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A support rail for holding and supplying power to a plurality of lighting modules. The support rail has first conductors for forming a first power supply circuit and second conductors for forming a second power supply circuit. The support rail additionally has a converter unit for electrically coupling the second power supply circuit to the first power supply circuit. The second power supply circuit also has a first coupling element for electrically connecting a first lighting module and a second coupling element for electrically connecting a second lighting module. The result of this design of the second power supply circuit is that a single converter unit is sufficient for converting a voltage for supplying power to the two lighting modules. In this way a particularly cost-effective and compact construction of the support rail becomes possible.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZUMTOBEL LIGHTING GMBHSCHWEIZER STR 30 6850 DORNBIRN 6850

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ladstaetter, Gerald Klaus, AT 9 57

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00