Pipe coupling construction, and coupling

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9829131
APP PUB NO 20160319970A1
SERIAL NO

14701905

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pipe coupling construction which can be used for coupling of a high-pressure pipe includes an inner bush of a non-metallic material and an outer bush, which bushes in axial section have parts which mesh with each other in order to transmit axial forces. The inner bush can be fused or adhered to an outer cover layer of the pipe. The coupling has a metal sleeve construction. The outer bush has an outer bush protruding end which protrudes with respect to the inner bush and the metal sleeve construction is at least partially located within the outer bush protruding end. The metal sleeve construction and outer bush in axial section have parts which mesh with each other.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PIPELIFE NEDERLAND B V1601 MA ENKHUIZEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cloos, Peter Jeroen Enkhuizen, NL 12 54
Van, Meegdenburg Jan Westwoud, NL 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00