Cooling control system for internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9828902
APP PUB NO 20160131017A1
SERIAL NO

14938090

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cooling control system for an internal combustion engine, which is capable of circulating engine coolant while suppressing power consumption by an engine coolant pump as much as possible. The cooling control system is provided for cooling intake gases increased in temperature by being pressurized by a supercharger. The engine coolant pump of the electrically-driven type delivers engine coolant to thereby cause the same to circulate. An ECU controls, when a difference between the temperature of the engine coolant and a first target temperature is not larger than a first predetermined value, the amount of the engine coolant to be delivered to a predetermined minimum flow rate, and controls, when the difference is larger than the first predetermined value, the amount of the engine coolant to be delivered such that it becomes larger as the difference is larger.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HONDA MOTOR CO LTDTOKYO 107-8556

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ihara, Kosuke Wako, JP 13 39
Tanaka, Yoshikazu Wako, JP 317 4051
Uto, Hajime Wako, JP 30 266
Yamada, Yosuke Wako, JP 63 420

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00