Modified Goswami cycle based conversion of gas processing plant waste heat into power and cooling with flexibility

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9828885
APP PUB NO 20170058709A1
SERIAL NO

14978277

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system includes a waste heat recovery heat exchanger configured to heat a heating fluid stream by exchange with a heat source in a crude oil associated gas processing plant; and a modified Goswami energy conversion system. The modified Goswami energy conversion system includes a first group of heat exchangers configured to heat a first portion of a working fluid by exchange with the heated heating fluid stream; and a second group of heat exchangers configured to heat a second portion of the working fluid. The modified Goswami energy conversion system includes a rectifier configured to receive the heated first and second portions of the working fluid and a third portion of the working fluid and to output an overhead discharge stream and a liquid stream, the third portion of the working fluid being at a lower temperature than the heated first and second portions of the working fluid. The modified Goswami energy conversion system includes a cooling subsystem including one or more cooling elements configured to cool a chilling fluid stream by exchange with the overhead discharge stream; and a turbine configured to generate power from the liquid stream of the working fluid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAUDI ARABIAN OIL COMPANY1 EASTERN AVENUE DHAHRAN 31311

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kamel, Akram Hamed Mohamed Dhahran, SA 61 395
Noureldin, Mahmoud Bahy Mahmoud Dhahran, SA 87 657

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00