Method for predicting hydrate formation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9828847
SERIAL NO

15317119

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for predicting a formation of hydrates in a wellbore/riser annulus during a drilling operation. The method includes logging actual mud properties. Actual sets of pressure and temperature data at given locations/intervals in the wellbore or in the drilling riser annulus are continuously measured and/or calculated. A theoretical temperature profile for the formation of hydrates dependent on mud properties and pressure as a function of a true vertical depth in a well is determined. The theoretical temperature profile for the formation of hydrates in a control system is stored. The measured and/or calculated actual sets of pressure and temperature data is compared with the theoretical temperature profile for the formation of hydrates. A signal is issued if the measured and/or calculated actual sets of pressure and temperature data falls below or is lower than a predefined safety margin for the theoretical temperature profile for the formation of hydrates.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUTURE WELL CONTROL ASTORDENSKJOLDS GATE 9 KRISTIANSAND 4612

International Classification(s)

loading....
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances20152016201720182019202020212022202320240255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Vavik, Dag Trondheim, NO 6 58

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 9 Citation Count
  • E21B Class
  • 11.26 % this patent is cited more than
  • 8 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges14875518350261417181717125701 - 1011 - 2021 - 3031 - 4041 - 5051 - 6061 - 7071 - 8081 - 9091 - 100100 +050100150200250300350400450500550600650700750800

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2029