Nickel-based super heat resistant alloy and method of manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9828661
SERIAL NO

14515675

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a nickel-based super heat resistant alloy and a method of manufacturing the same. In the nickel-based super heat resistant alloy according to the present invention, an amount of solid solution strengthening elements (chromium, cobalt, molybdenum, or tantalum) is adjusted to improve a mechanical property, such as a creep property, at high temperatures, and aluminum or titanium is included in a predetermined amount to improve a corrosion property. The nickel-based super heat resistant alloy has excellent elongation, strength, and creep properties at normal temperature and high temperatures, and thus it is possible to manufacture parts of, by way of non-limiting example, a thermoelectric power plant, an aircraft, or a very high temperature reactor in various shapes on a large scale.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA ATOMIC ENERGY RESEARCH INSTITUTEDAEJEON KOREA DAEJEON

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jung, Sujin Chungcheongbuk-do, KR 62 252
Kim, Dong-Jin Daejeon, KR 88 590
Kim, Hong Pyo Daejeon, KR 11 44
Kim, Sung-Woo Daejeon, KR 65 1310
Lim, Yun-Soo Daejeon, KR 1 0
Moon, Byung-Hak Gwangju, KR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00