Interface breakdown-proof locomotive roof composite insulator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9828005
SERIAL NO

15108005

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An interface breakdown-proof locomotive roof composite insulator. The composite insulator comprises: a support body; and at least five shed groups arranged side by side along the axial direction that are provided around the sidewall of the support body, the at least five shed groups includes: at least four shed groups located on the upper end with each group including a large shed and a small shed; and at least one shed group located on the undermost end with each group including two small sheds. For such a shed structure, it is favorable to tolerate impulse voltage, and it is difficult for the interface to be broken down; the electric field on the interface even does not exceed 3 kV/mm, and even if a gas exists on the interface, it will not break through the interface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BEIJING RAILWAY INSTITUTE OF MECHANICAL & ELECTRICAL ENGINEERING CO LTD100071 NO 5 SPORTS ROAD BEIJING FENGTAI DISTRICT MUNICIPAL DISTRICT BEIJING CITY 100071

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Sha Beijing, CN 68 512
Liu, Guangdan Beijing, CN 3 7
Liu, Jiangfeng Beijing, CN 5 4
Shen, Xiaoqing Beijing, CN 2 4
Wang, Leren Beijing, CN 2 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00