Tire device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9827815
APP PUB NO 20160031273A1
SERIAL NO

14776220

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tire device includes a vibration power generating element, a signal processing unit, and a transmitter. The vibration power generating element is arranged inside a tire and outputs a voltage corresponding to a time variation of a vibration generated in a tread of the tire. The signal processing unit is disposed inside the tire and performs signal processing on the voltage outputted from the vibration power generating element. The transmitter is arranged inside the tire and sends data subjected to the signal processing in the signal processing unit to a device provided outside the tire. The signal processing unit and the transmitter are driven by power generated in the vibration power generating element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DENSO CORPORATION1-1 SHOWA-CHO KARIYA-CITY AICHI-PREF 448-8661
NIPPON SOKEN INC14 IWAYA SHIMOHASUMI-CHO NISHIO-CITY AICHI-PREF 445-0012

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mori, Masashi Obu, JP 125 1020
Saitou, Takashi Okazaki, JP 58 361
Sekizawa, Takatoshi Kariya, JP 65 342
Suzuki, Youichirou Okazaki, JP 27 275
Takaoka, Akira Okazaki, JP 49 309
Watabe, Nobuya Nagoya, JP 72 609

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00