Process for forming a foam product integral with surface cover element

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9827698
APP PUB NO 20150298371A1
SERIAL NO

14436238

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process is provided for forming a foam product integral with a cover surface, which restricts emission of the carbon oxide during the step of preparing a carbon-oxide-mixed liquid by mixing carbon oxide into a first material containing polyol as a primary ingredient; under a pressure applied thereto. The process includes a first step wherein a carbon-oxide-mixed liquid material is prepared by mixing carbon oxide C into a first material containing polyol as a primary ingredient, under a pressure applied thereto, without effecting a forced stirring during said first step; a second step wherein said carbon-oxide-mixed liquid material and a second material containing isocyanate as a primary ingredient are impinged on and mixed with each other in a high-pressure foaming agent preparation device, thereby providing a resultant urethane material as a liquid urethane foaming agent; and a third step wherein said liquid urethane foaming agent produced at said second step is introduced toward an inside of a surface cover element under a pressure applied thereto.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TACHI-S CO LTD1-3-1 SUEHIRO-CHO OME-SHI TOKYO 1980025

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tabata, Tsuyoshi Tokyo, JP 34 196

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00