Diamond composite cutting tool assembled with tungsten carbide
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Nov 28, 2017
Grant Date -
Aug 4, 2016
app pub date -
Jan 30, 2015
filing date -
Jan 30, 2015
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
A tool and a method of making the tool are disclosed. The tool includes a superabrasive compact, for example, a volume of silicon carbide diamond bonded composite, directly bonded to a tungsten carbide body during sintering. The green body may have a recess with a complementary shape to the superabrasive compact, whereby after inserting at least a part of the superabrasive compact within the recess and sintering, the tungsten carbide body and the recess shrink to form an interference fit therebetween.
First Claim
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
DIAMOND INNOVATIONS INC | 6325 HUNTLEY ROAD WORTHINGTON OH 43085 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Easley, Thomas Charles | Bexley, US | 4 | 6 |
# of filed Patents : 4 Total Citations : 6 | |||
Kaiser, Stephen Allen | Lupton, US | 1 | 0 |
# of filed Patents : 1 Total Citations : 0 | |||
Malik, Abds-Sami | Westerville, US | 16 | 46 |
# of filed Patents : 16 Total Citations : 46 | |||
Selinder, Torbjorn | Bandhagen, SE | 20 | 222 |
# of filed Patents : 20 Total Citations : 222 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | May 28, 2025 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | May 28, 2029 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events

Matter Detail

Renewals Detail
