Machine for making absorbent sanitary articles

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9827148
SERIAL NO

14343294

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A machine for making absorbent sanitary articles, where each article includes components progressively positioned relative to each other and assembled along a production line. The machine includes a programmable electronic controller device having a shift register, at least one optical inspection system connected to the programmable electronic controller device, and an operator interface connected to the electronic controller. The programmable electronic controller device generates a machine sync signal, a trigger signal for activating the optical inspection system in phase with the sync signal and a shift register shift command. The optical inspection system receives the trigger signal and has a defined maximum response time which produces at least one band of uncertainty. The operator sets with the operator interface the instant of activating the shift register shift command outside the band of uncertainty and between two consecutive sync signals defining a machine step.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GDM S P AVIA BATTINDARNO 91 BOLOGNA 40133

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Perego, Alberto Milan, IT 22 267
Piantoni, Matteo Albino, IT 83 310

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00