Cloud-based multi-channel stage light adjustment system technical field

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9826606
SERIAL NO

15229309

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The cloud-based multi-channel stage light adjustment system of the present patent application includes a cloud-based control center, an encoding and modulation unit, a ZIGBEE transceiving unit, a proximal end lighting regulation unit and the stage lighting sets. The cloud-based control center further comprises an interference reduce and light adjustment unit, a scenario generation unit and an instruction switching unit, achieves a multi-channel control of stage light adjustment, greatly reduces the interference with other stage systems, while adopts the multi-point transceiving model which is based on ZIGBEE to improve the transmission efficiency of regulation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZHEJIANG DAFENG INDUSTRY CO LTD315400 737 NEW NORTH ROAD YANGMING SCIENCE AND TECHNOLOGY INDUSTRIAL PARK YUYAO NINGBO ZHEJIANG NINGBO CITY ZHEJIANG PROVINCE 315400

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Feng, Hua Yuyao, CN 38 57
Liu, Zhen Yuyao, CN 414 5359
Wu, Lifeng Yuyao, CN 25 141
Wu, Zhengping Yuyao, CN 4 2
Xu, Haoxiang Yuyao, CN 2 0
Yan, Huafeng Yuyao, CN 5 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00