Method for supplying power to a load within a portable electronic device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9825478
APP PUB NO 20150311738A1
SERIAL NO

14691010

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power system within a portable electronic device is disclosed. In order to discharge electricity stored in a rechargeable battery within the portable electronic device to a discharge cutoff voltage, a charge booster charges the rechargeable battery with electric power coming from an AC/DC adaptor. When the AC/DC adaptor is detached, the charge booster performs boosting operation to supply power to a load from the rechargeable battery. The charge booster operates only when input voltage of the load decreases. A direct discharge circuit operates in conjunction with the charge booster, and when the charge booster does not perform any boosting operation, electric power is supplied directly from the rechargeable battery to a DC/DC converter. The charge booster can keep the input voltage of the DC/DC converter until the voltage reaches a discharge cutoff voltage of the rechargeable battery, and then stops operation when electric power is being supplied from the direct discharge circuit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LENOVO SWITZERLAND INTERNATIONAL GMBHC/O BRIGHT LAW AG BUNDESPLATZ 9 ZUG 6300

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nagata, Nozomu Kanagawa-ken, JP 3 14
Odaohhara, Shigefumi Kanagawa-ken, JP 70 1796

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00