Positive active material for lithium secondary battery and method of preparing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9825291
SERIAL NO

14375140

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of preparing a positive active material for a lithium secondary battery represented by the following Chemical Formula 1 (LiwNixCoyMn1-x-y-zMzO2) includes: (a) preparing a metal salt aqueous solution including a lithium raw material, a manganese raw material, a nickel raw material, and a cobalt raw material; (b) wet-pulverizing the metal salt aqueous solution using beads having a particle diameter of 0.05 to 0.30 mm at 2000 to 6000 rpm for 2 to 12 hours to prepare a slurry; (c) adding a carbon source to the slurry; (d) spray-drying the slurry of the step (c) to prepare a mixed powder; and (e) heat-treating the mixed powder.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA ELECTRONICS TECHNOLOGY INSTITUTE25 SAENARI-RO BUNDANG-GU SEONGNAM-SI GYEONGGI-DO 13509 13509

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Jae-Hun Yongin-si, KR 48 169
Kim, Young Jun Yongin-si, KR 189 1082
Lee, Kyoung Joon Seoul, KR 7 64
Lee, Min-Woo Ansan-si, KR 88 518
Song, Jun Ho Seongnam-si, KR 126 626

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00