Semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9825027
SERIAL NO

15412035

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device has a plurality of transistors, which have first electrodes in first trenches, and includes: two second trenches, which are formed side by side between the first trenches. A second electrode is formed in each of the two second trenches. A first impurity region is formed between the first trench and the second trench; a second impurity region is formed to abut on the first trench; a third impurity region is formed to abut on the second trench; a fourth impurity region, which is formed between two of the second trenches and has a higher impurity concentration than the first impurity region; and a fifth impurity region is formed below the first impurity region and the fourth impurity region. A third electrode is formed to be electrically connected to the first impurity region, the second impurity region, the third impurity region, and the fourth impurity region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SANKEN ELECTRIC CO LTD3-6-3 KITANO NIIZA-SHI SAITAMA-KEN 352-8666

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukunaga, Shunsuke Niiza, JP 18 34
Kondo, Taro Niiza, JP 20 32

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00