Lead frame and method for manufacturing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9824960
SERIAL NO

15212476

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a lead frame including: one or more solder bonding regions containing copper material or copper plating; and a molding resin adhesion region containing a copper oxide film. The solder bonding regions are exposed on a surface of the lead frame. Further, provided is a lead frame manufacturing method including: forming a resist film in a molding resin adhesion region that is included in a surface of a lead frame member made of copper, or that is included in a surface of a copper-plated lead frame member; forming a plating film by performing a metal plating process on one or more solder bonding regions included in the surface of the lead frame member; removing the resist film; and forming a copper oxide film by oxidizing the molding resin adhesion region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUI HIGH-TEC INCFUKUOKA PREFECTURE FUKUOKA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Furuno, Ryota Fukuoka, JP 6 9
Ishibashi, Takahiro Fukuoka, JP 16 205
Katsuda, Takaaki Fukuoka, JP 2 8
Kubo, Kimihiko Fukuoka, JP 6 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00