Interferometric system with multiaxial optical fibre and method for processing an interferometric signal in such a system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9823076
APP PUB NO 20160231120A1
SERIAL NO

15023747

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An interferometric system with multi-axis optical fiber and a method for processing an interferometric signal in such a system, the multi-axis interferometric system includes a light source (1); a plurality of N optical-fiber coils (11, 12), a first optical separation element (3) capable of splitting the source beam (100) into a first split beam (140) and a second split beam (240); shared phase-modulation element (4); a photodetector (2) and a signal-processing system (800). The N optical-fiber coils (11, 12) are connected in parallel, the coils having respective transit times T1, T2, . . . TN that all differ from one another, and the signal-processing system (800) is capable of processing the interferometric signal (720) detected by the shared photodetector (2) as a function of the respective transit times in the various coils.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EXAIL78100 SAINT-GERMAIN-EN-LAYE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ducloux, Eric Rueil Malmaison, FR 12 10
Ferrand, Sebastien Paris, FR 3 13
Guattari, Frederic Aubervilliers, FR 9 29
Molucon, Cedric Saint Germain en Laye, FR 8 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00