Ignition control device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9822753
SERIAL NO

14903897

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An ignition control device includes a control unit to control first to third switching elements so that during ignition discharge, which is started by turning off the first switching element, energy stored on a capacitor is discharged by turning off the third switching element and turning on the second switching element for supplying a primary current to an end of a primary winding opposite to an end thereof connected to a direct-current power supply. During inductive discharge of a spark plug, the control unit non-intermittently turns on the second switching element so that the second switching element is turned on over a successive energy input time period, according to the operating conditions of an internal combustion engine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DENSO CORPORATION1-1 SHOWA-CHO KARIYA-CITY AICHI-PREF 448-8661

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishitani, Masahiro Kariya, JP 10 79
Kondou, Yuuki Kariya, JP 12 84
Nakayama, Satoru Kariya, JP 25 138
Sugiura, Akimitsu Kariya, JP 58 227
Toriyama, Makoto Kariya, JP 25 231

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00