Control system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9822717
APP PUB NO 20160010574A1
SERIAL NO

14862563

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method control a powered system having an engine configured to operate using a plurality of fuel types. A first set of control signals including a first set of valve signals are communicated to each fuel tank based at least in part on a first stored engine operating profile to control amounts of fuel provided from each fuel tank to the engine. A different, second set of control signals including a second set of valve signals are communicated to the fuel tanks based at least in part on a second stored engine operating profile to control or change the amounts of fuel from each fuel tank to the engine. The system and method can switch between operating conditions associated with different external domains to alter the engine operating profile used to control the fuel or fuels supplied to the engine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE GLOBAL SOURCING LLC901 MAIN AVENUE NORWALK CT 06851

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Daum, Wolfgang Greenfield, US 180 8143
Kumar, Ajith Kuttannair Erie, US 425 8886

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00