Method and apparatus for controlling downhole rotational rate of a drilling tool

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9822587
SERIAL NO

14961544

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A downhole rotational rate control apparatus, adapted for coupling to the lower end of a drill string, includes a progressive cavity pump or motor, a mud flow control valve, and an electronics section. Drilling mud flowing downward through the drill string is partially diverted to flow through the pump or motor, with the mud flow rate and, in turn, the pump or motor speed being controlled by the mud flow control valve. The control valve is actuated by a control motor in response to inputs from a sensor assembly in the electronics section. By varying the rotational rate of the pump or motor relative to the rotational rate of the drill string, the tool face orientation or non-zero rotational speed of the controlled device in either direction can be varied in a controlled manner.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NOV CANADA ULC4300 BANKERS HALL WEST 888 - 3RD STREET S W CALGARY ALBERTA T2P 5C5

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Johns, Ralph William Graeme Edmonton, CA 4 32
Marchand, Nicholas Ryan Edmonton, CA 32 213
Prill, Jonathan Ryan Edmonton, CA 23 308

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00